Looks like good stuff

Portland has replaced a section of its existing water supply network with Lucid Energy pipes containing four forty-two inch turbines. As water flows through the pipes, the turbines spin and power attached generators, which then feed energy back into the city’s electrical grid.



continued...

Fast Company points out that, in order to be cost and energy effective, Portland’s new power generators must be installed in pipes where water flows downhill, without having to be pumped, as the energy necessary to pump the water would negate the subsequent energy gleaned. However, Fast Company also notes that the system does more than simply provide electricity: It can monitor both the overall condition of a city’s water supply network as well as assess the drinking quality of the water flowing through it.

Portland Now Generates Electricity From Turbines Installed In City Water Pipes

36
likes

Post new comment

The content of this field is kept private and will not be shown publicly.
  • Lines and paragraphs break automatically.
  • Web page addresses and e-mail addresses turn into links automatically.

More information about formatting options

CAPTCHA
This question is used to make sure you are a human visitor and to prevent spam submissions.

style="display:block"
data-ad-format="autorelaxed"
data-ad-client="ca-pub-3296520478850753"
data-ad-slot="5999968558">

TN Progressive

TN Politics

Knox TN Today

Local TV News

News Sentinel

Alt Weekly

State News

Local .GOV

State .GOV

Wire Reports

Lost Medicaid Funding

To date, the failure to expand Medicaid/TennCare has cost the State of Tennessee ? in lost federal funding. (Source)

Monthly archive